Soil Mitigation measures Beneath Two RC pipe encasement / culverts
| 2020
Client: Acwapower – RABEC
Overview: Construction of Micropiles to underpin newly constructed RC slab, Controlled compaction grouting beneath GRP lines attached to the Encasements to ensure the compaction of the bedding layer, Section enlargements of RC encasements & installation of a monitoring system to ensure the stability of the encasement after the corrective measures.