Soil Mitigation measures @ RABEC Facilities
@ RABEC Facilities | 2019
Client: Rabigh Electricity Co. / Acwapower Group
Overview: Soil mitigation measures beneath selected structures to control the soil settlement. The project scope involved Soil permeation grouting using resin injection 2. Perform Controlled Compaction Grouting using a European patent compaction grouting methodology. Design & installation of long-term real-time settlement monitoring system @ selected facilities across the plant to verify the effectiveness of the mitigation measures in the long term. Validation of mitigation measures was conducted by Geophysical scanning & Geotech. tests.