Rehabilitation of Existing lift station@ KAIA King Abdulaziz International Airport | 2018Client: Makkah Municipality Overview: replacement of MEP network pipes, valves & pumps @ the existing lift station. The project scope involved working without affecting the operation of the Airport sewage management system.Contact UsAddress:Al Juhd AL Mukhlis street Al Andalus District Jeddah – KSA P.O. Box 10214 Jeddah 21433[...]
Tags: 2018, Concrete Repair and Structural Strengthening, GACA
Rehabilitation of walls & ceiling @ elevated RC water tanks in SAWACO water treatment plants Jeddah | 2018Client: S.W.A.C.O. Overview: Repair of deteriorated tank ceiling by form & pump technique, application of Polyurea protective lining on the internal walls & floors of potable water reservoirs.Contact UsAddress:Al Juhd AL Mukhlis street Al Andalus District Jeddah – KSA[...]
Tags: 2018, Concrete Repair and Structural Strengthening, S.W.A.C.O. Geophysical and Geotechnical investigation for Soil Bedding two GT transformers in RABEC power plant
Geophysical and Geotechnical investigation for Soil Bedding two GT transformers in RABEC power plant. RABEC power plant. | 2018Client: Rabigh Electricity CO. Acwapower Overview: Perform ERT investigation for purpose of allocating the Soil anomalies beneath Live transformers and develop mitigation Solutions for the soiled bedding of the said transformers’ footings. The scope was done in cooperation[...]
Tags: 2018, Condition Assessment, Rabigh Electricity CO. Acwapower
Rehabilitation of strategic South water reservoirs @ KAIA 2012| 2018 Client: GACA Overview: Corrosion repair using Gunite concrete & ” form & pump” method, crack injection, & Protective coating. The old MEP network was replaced by a new HDPE network with all corresponding valves. The project involved the construction of supporting civil facilities & installation of SACADA[...]
Tags: 2012, Concrete Repair and Structural Strengthening, GACA