[...]
Concrete rehabilitation & waterproofing of deteriorated surfaces @ KFIA facilities ( phase 2)
January 29, 2022 | No Comments
[...]
Soil Mitigation measures in selected facilites @ RABEC plant – phase2
January 28, 2022 | No Comments
[...]
Repair of Joint sealant @ 5 APRONS in KAIA
January 28, 2022 | No Comments
[...]
Repair of deteriorations @ Arabian Saudi Glass Factory basement
January 29, 2021 | No Comments
[...]
Strengthening Of Columns @ Al Keswah Towers Hotel in Makkah Central Area
January 29, 2021 | No Comments
[...]
Condition Assessment of Soil beneath Al Jokhadar and Qabil Houses @ Jeddah Historical City
January 29, 2021 | No Comments
[...]
Condition Assessment of Soil bedding GRP lines
January 29, 2020 | No Comments
[...]
Soil Mitigation measures Beneath Two RC pipe encasement / culverts
January 29, 2020 | No Comments
[...]
Repair of FGD and MSF Structures @ SWEC Power plant in Shuaibah
January 28, 2020 | No Comments
[...]
Soil Mitigation measures @ RABEC Facilities
February 8, 2019 | No Comments
[...]
Geophysical Investigation and Condition assessment of Soil bedding Heavy Cube Fuel Tanks
January 29, 2019 | No Comments
[...]
Soil Mitigation Beneath Beit Al Daffa – Jed. Historical City
January 29, 2019 | No Comments
[...]
Rehabilitation of Existing lift station @ KAIA
January 29, 2018 | No Comments
[...]
Rehabilitation of walls & ceiling @ elevated RC water tanks in SAWACO water treatment..
January 29, 2018 | No Comments
[...]
Rehabilitation of Makkah Tunnels and Bridges
January 29, 2017 | No Comments
[...]
Repair of leakage in Bin Abboush Hotel – Jeddah
January 29, 2017 | No Comments
[...]
Modification works @ Global Gypsum Co. – Yanbu
January 28, 2017 | No Comments
[...]
Repair Of cracks & application of Protective paint @ North Sewage lift station – Jeddah
January 29, 2016 | No Comments
[...]
REPAIR OF leakage in 4 meter Dia. GRP PIPES joints, Rabec Power Plant – RABEC
January 29, 2016 | No Comments
[...]
Renovation of Two male & female Toilet Units @ KAIA south terminal
January 28, 2016 | No Comments
[...]
Repair of construction defects in Haram Expansion project – Makkah
January 29, 2015 | No Comments
[...]
Application of protective coating system to different bridges-Makkah
January 29, 2015 | No Comments
[...]
Repair of side walls
January 29, 2015 | No Comments
[...]
Refurbishment of chilled water air conditioning system @ KAIA north & south terminal
January 28, 2015 | No Comments
[...]
Rehabilitation of Al Kaaki commercial center in Madina road – Jeddah
January 28, 2015 | No Comments
[...]
Rehabilitation of selected structures @ KFIA – Dammam
January 29, 2014 | No Comments
[...]
Rehabilitation of strategic North & South water reservoirs @ KAIA
January 29, 2012 | No Comments
[...]
Repair / replacement of 400 HZ cables @ KAIA airside taxiway
January 29, 2011 | No Comments
[...]
Development of load centre#1 @KAIA
January 28, 2010 | No Comments
[...]
Concrete repair of seven cells at load centre
January 28, 2009 | No Comments
[...]
Concrete repair of safari hotel basement garage
January 28, 2009 | No Comments
[...]
Contact Us
Address:
Al Juhd AL Mukhlis street
Al Andalus District
Jeddah – KSA
P.O. Box 10214 Jeddah 21433
Kingdom of Saudi Arabia
Al Andalus District
Jeddah – KSA
P.O. Box 10214 Jeddah 21433
Kingdom of Saudi Arabia
Customer Support:
Tel: + 966 126 949 974
Tel: + 966 126 990 162
Email: info@skyjeddah.com
Maintenance of SNB HQ Facade- Jeddah
January 30, 2022 | No Comments