Soil Mitigation measures in selected facilities @Acwapower RABEC | Running Client: Acwapower – RABEC Overview: The scope involved the repair of soil settlement beneath Generator building by Resin permeation grouting, soil improvement of Dyke pond walls by cement grouting, Stabilization of GRP concrete pipe encasement & soil mitigation measures beneath Two live HV transformers by performing horizontal[...]
Tags: Acwapower - RABEC, Concrete Repair and Structural Strengthening, running
Soil Mitigation measures Beneath Two RC pipe encasement / culverts| 2020Client: Acwapower – RABEC Overview: Construction of Micropiles to underpin newly constructed RC slab, Controlled compaction grouting beneath GRP lines attached to the Encasements to ensure the compaction of the bedding layer, Section enlargements of RC encasements & installation of a monitoring system to ensure the[...]
Tags: 2020, Acwapower - RABEC, Soil Mitigation
REPAIR OF leakage in 4 meter Dia. GRP PIPES joints, Rabec Power Plant - RABEC.RABEC | 2016 Client: Acwapower – RABEC Overview: A multi-component aqueous resin and acrylic gel were used Stop leaks in pipe joints and get them dry before applying GFRP lamination kits by the Sky Jeddah team. The job was critical due to[...]
Tags: 2016, Acwapower - RABEC, Concrete Repair and Structural Strengthening